NORSOK M-501
System 1 Carbon steel with maximum operating temperature <120¡æ
Pre-qualification is required
| Surface Preparation | Zinc Primer | ¶Ù¹ó°Õ(¦Ì³¾) | Intermediate Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Top Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ZINCTECT 500 | 60 | EPOTECT HB (M) | 200 | RETANTECT 6000 (M) | 50 | 310 |
| ZINCTECT 1500 QD-85 | 75 | EPOTECT HB (M) | 175 | RETANTECT 6000 (M) | 60 | 310 | |
| ZINCTECT 500 | 60 | EPOTECT HB (M) QD | 200 | RETANTECT 6000 (M) | 50 | 310 | |
| ZINCTECT 1500 QD-85 | 75 | EPOTECT HB (M) QD | 175 | RETANTECT 6000 (M) | 60 | 310 | |
| ZINCTECT 500 | 60 | EPOTECT AL | 200 | RETANTECT 6000 (M) | 50 | 310 | |
| ZINCTECT 1500 QD-85 | 75 | EPOTECT AL | 175 | RETANTECT 6000 (M) | 60 | 310 | |
| ZINCTECT 500 | 60 | EPOTECT HB (M) | 160 | RETANTECT 6000 (M) | 60 | 280 | |
| ZINCTECT 1500 QD-85 | 75 | EPOTECT HB (M) | 145 | RETANTECT 6000 (M) | 60 | 280 | |
| ZINCTECT 500 | 60 | EPOTECT HB (M) QD | 160 | RETANTECT 6000 (M) | 60 | 280 | |
| ZINCTECT 1500 QD-85 | 75 | EPOTECT HB (M) QD | 145 | RETANTECT 6000 (M) | 60 | 280 | |
| ZINCTECT 500 | 60 | EPOTECT AL FE | 160 | RETANTECT 6000 (M) | 60 | 280 | |
| ZINCTECT 1500 QD-85 | 75 | EPOTECT AL FE | 145 | RETANTECT 6000 (M) | 60 | 280 |
*The above systems are under testing.
System 2A Thermally sprayed aluminum
Pre-qualification is not required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | THERMOTECT 600 SC | 25 | 25 |
System 2B Thermally sprayed zinc or alloys of zinc top coated
Pre-qualification is required for intermediate and topcoat as per system1
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | EPOTECT HB(M) | 125 | RETANTECT 6000 (M) | 75? | 200 |
*The above system is under testing.
**Tie coat will be recommendable to avoid popping. Epomarine Primer for Mist Coat shall be used for tie coat.
System 3A Potable water tanks
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 3B Ballast water tanks/internal seawater filled compartments
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Available*1 | Available*1 |
*1:Please contact Kansai representative for further information.
System 3C Tanks for stabilised crude, diesel and condensate
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 3D Process vessels <0.3MPa <75¡æ
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 3E Process vessels <7.0MPa <80¡æ
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 3F Process vessels <3.0MPa <130¡æ
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 3G Vessels for storage of methanol, mono ethyl glycol etc.
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 4 Walkways, escape routes and lay down areas.
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 5A Epoxy based fire protection
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 5B Cement based fire protection
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | Not available |
System 6A Stainless steel
Pre-qualification is required
| Surface Preparation | Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| Sweep blast | EPOTECT GX | 50 | EPOTECT HB (M) | 115 | RETANTECT 6000 (M) | 60 | 225 |
System 6B Galvanised steel
Pre-qualification is required
| Surface Preparation | Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| Clean with alkaline detergent followed by hosing with fresh water | EPOTECT GX | 50 | EPOTECT HB(M) | 115 | RETANTECT 6000 (M) | 60 | 225 |
System 6C Insulated stainless steel piping <150¡æ
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| Sweep blast | ? | ? | THERMOTECT EP | 125 | THERMOTECT EP | 125 | 250 |
System 7A Carbon and Stainless steel in splash zone
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | TECTBARRIER SP (A) 500 | 500 | TECTBARRIER SP (A) 500 | 500 | 1000 |
| ? | ? | EPOTECT GF (M) | 250 | EPOTECT GF (M) | 250 | 500 |
*The above systems are under testing.
System 7B Submerged carbon and stainless steel ¨Q50¡æ
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | TECTBARRIER SP (A) 500 | 500 | TECTBARRIER SP (A) 500 | 500 | 1000 |
| ? | ? | EPOTECT GF (M) | 250 | EPOTECT GF (M) | 250 | 500 |
*The above systems are under testing.
System 7C Submerged carbon and stainless steel >50¡æ
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | Not available | ? | Not available | ? | ? |
System 8 Structural carbon steel with maximum operating temperature ¨Q80¡æ in internal and fully dry and ventilated area.
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | ZINCTECT 500 | 60 | EPOTECT HB(M) | 25 | 85 |
| ? | ? | EPOTECT HB | 150 | 150 |
System 9 Bulk supplied carbon steel valves with maximum operating temperature up to 150¡æ.
Pre-qualification is required
| Surface Preparation | Shop Primer | ¶Ù¹ó°Õ(¦Ì³¾) | 1st Coat | ¶Ù¹ó°Õ(¦Ì³¾) | 2nd Coat | ¶Ù¹ó°Õ(¦Ì³¾) | Total ¶Ù¹ó°Õ(¦Ì³¾) |
|---|---|---|---|---|---|---|---|
| ISO Sa2.5 | ? | ? | EPOTECT PC100 PH | 150 | EPOTECT PC100 PH | 150 | 300 |